Weld County secures $3M grant to replace flood-damaged bridge by 2025

Weld County secures $3M grant to replace flood-damaged bridge by 2025

Amy Richards
Amy Richards•
• 2 Min.
Black-and-white photograph of the New McKinley Bridge in St. Louis, Missouri, spanning a river with utility poles and wires along its sides, trees and buildings in the background, and text at the top.

Weld County secures $3M grant to replace flood-damaged bridge by 2025

Weld County has secured a major grant to replace an ageing bridge over the Little Thompson River. The $3 million funding boost will help upgrade a structure damaged in the 2013 floods and now deemed obsolete. Around 3,000 vehicles rely on the bridge daily for travel between Milliken and Johnstown. The existing bridge, built in 1960, suffered severe damage during the 2013 Colorado floods. Since then, it has been classified as functionally obsolete, prompting calls for a modern replacement. Officials have now obtained $3 million through the Special Highway Committee and the Colorado Department of Transportation’s Off-System Bridge Program.

Originally, the grant stood at $500,000, but the Weld County Board of Commissioners successfully increased it to $3 million. This funding will cover part of the estimated $11 million cost for the new structure. The upgraded bridge will meet current safety standards and be designed to withstand a 100-year flood event. Key improvements include a significantly raised deck to allow floodwaters to pass underneath. Wider shoulders will also enhance safety for drivers. The project aims to strengthen regional infrastructure while supporting daily travel and long-term resilience against future flooding.

The replacement bridge will improve safety, efficiency, and flood resistance for thousands of daily commuters. Construction will address long-standing concerns after the 2013 floods while preparing for future weather challenges. The project reflects ongoing investment in Weld County’s transport network and disaster preparedness.